# The Romford Town Centre Masterplan

*Category: The wider town*
*Topics: urban planning, regeneration, transportation, environmental sustainability, historic preservation*

The Romford Town Centre Masterplan is a Supplementary Planning Document that aims to guide the growth and development of Romford, a designated Opportunity Area and Housing Zone within the London Plan. The masterplan proposes various initiatives, including the creation of a new western station entrance, the transformation of the Ring Road into an Urban Boulevard, and the daylighting of the River Rom. The plan also focuses on preserving historic assets, introducing a finer urban grain, and promoting sustainable development. The masterplan has been adopted by the Havering Cabinet and is designed to influence private landowner developments and leverage financial contributions toward public realm improvements.

## Key points

- 10,900-12,000 new homes planned by 2041
- Station Gateway project to maximize Elizabeth Line utility
- Transformation of Ring Road into an Urban Boulevard
- Daylighting of the River Rom and creation of a linear ecological park
- Protection of historic urban grain and introduction of finer urban grain

## Content

Romford is formally designated as an **Opportunity Area** and a **Housing Zone**
within the London Plan. To realise the growth targets attached to those
designations, the London Borough of Havering developed the Romford Town Centre
Masterplan.

After community engagement running from 2019 to late 2024 and a formal
consultation phase involving statutory bodies, major landowners and residents,
the Havering Cabinet approved adoption of the Masterplan as a **Supplementary
Planning Document on [12 March 2025](https://www.havering.gov.uk/downloads/file/6970/romford-masterplan-adoption-statement)**, taking effect
immediately on adoption.

The SPD is a binding strategic policy document, designed to influence private
landowner developments and leverage financial contributions toward public realm
improvements. It identifies capacity for **10,900–12,000 new homes** on a
trajectory extending to **2041**.

An earlier version of this page also carried a figure of "up to 2,500 new
jobs". It has been removed: the number could not be traced to the SPD, the
accompanying environmental report, the Cabinet report or the adoption
statement. The employment figures that *are* sourceable are the GLA's, and they
are an order of magnitude lower — **500 jobs** for the Romford Opportunity Area
in the London Plan 2021, raised to **700** in the 2021 London Employment Sites
Database. Where this site cannot find a source for a number, it removes the
number.

## Transport and the Station Gateway

A central pillar is maximising the utility of the Elizabeth Line through the
"Station Gateway" project, which identifies the area around Romford Station as
a primary locus for high-density residential and employment development.

Most consequentially for Cotleigh Road, the SPD proposes a **new formalised
western station entrance on Exchange Street**, developed with Network Rail. It
is designed to relieve pressure on the primary southern entrance while drawing
footfall westward toward the Waterloo Estate — compressing pedestrian transit
times for Cotleigh Road residents and pulling the street deeper into the
premium commuter footprint.

### Recharacterising the Ring Road

The Masterplan also addresses the severance caused by Romford's vehicular
infrastructure. The four-lane Ring Road has historically acted as a concrete
barrier isolating the town centre from its residential hinterlands. Using
funding from Transport for London's Liveable Neighbourhoods Programme, the SPD
directs its transformation into an **"Urban Boulevard"**: removing pedestrian
underpasses and guardrails, replacing them with at-grade street-level crossings
surrounded by extensive planting and active travel corridors.

Softening that boundary collapses the perceived distance between Cotleigh Road
and the commercial core of Romford.

### Parking

Alongside this, controlled parking zones — including the **ROST zone**, which
encompasses Cotleigh Road and adjacent streets — have been introduced as part of
a rationalised town centre parking approach. All-day visitor permits are priced
at £39 for ten visits, protecting residential parking utility from commuter
overspill while preserving flexibility for occupants.

## Heritage and urban grain

The Masterplan distinguishes carefully between preserving historic assets and
modernising commercial zones. It explicitly mandates protection of the
**"historic urban grain"** — narrow building frontages and intricate alleyways —
in the Market Place, South Street and North Street.

Conversely, for the mid-twentieth-century retail complexes (the Brewery,
Liberty and Mercury shopping centres), which the Masterplan notes did not
replace any historically significant urban grain, policy recommends introducing
a new **"finer urban grain"**: evolving enclosed big-box retail into networks of
open, publicly accessible streets with high-density housing stacked above
flexible retail and commercial workspace. The intent is to shift the local
economy away from traditional office space toward flexible studios, attracting
creative industries displaced from central London.

## The Blue Strategy: daylighting the River Rom

The most transformative element is the environmental infrastructure agenda
concerning the **River Rom**. Over the past century vast sections of the river
were buried in subterranean concrete culverts to maximise surface area for
retail parking and commercial development. The Masterplan mandates systematic
**deculverting** — daylighting the hidden waterways back to the surface.

The flagship project is **Brewery Gardens**, a 1.1-hectare linear ecological
park carved through the town centre. This requires heavy engineering to open the
culverts, followed by soft landscaping of the riverbanks, marginal aquatic
planting and new pedestrian bridges giving public access to the water.

The rationale extends beyond aesthetics. The renaturalised river functions as a
large nature-based Sustainable Drainage System, materially improving the
borough's resilience against severe flood events. Consultation feedback noted
that deculverting poses significant viability and funding challenges for
developers; the Masterplan's position is that the long-term value added to the
local environment, public health and real estate economy surpasses immediate
point-in-time cost calculations.

Proximity to parks and waterways is often cited as a driver of value, though
this site has not tested that on Cotleigh Road and does not assert it. What can
be said plainly is that a daylighted river and a linear park within walking
distance would be a material change to the surroundings, and that the scheme is
at masterplan stage — identified, not funded, and not consented.

## Related on this site

- [The Waterloo Estate regeneration](/waterloo-estate) — the one scheme in this
  masterplan already approved and building, on Cotleigh Road's boundary
- [The history of Romford town centre](/romford-history) — the heritage
  assessment prepared as evidence for this masterplan, read in full
- [Nearby streets](/nearby-streets-and-regeneration) — the ring road and the
  streets between here and the town centre
- [Sources](/sources) — the SPD, its adoption statement and the supporting
  reports
- [How Romford responded to it](/romford-masterplan-response) — the
  consultation figures, and why the River Rom was the popular part

## Source

- Canonical URL: https://cotleighroad.com/romford-masterplan
- Typed record: https://cotleighroad.com/index.json
